Mobile
Log In Sign Up
Home > english-chinese > "secondary beam" in Chinese

Chinese translation for "secondary beam"

次级电子注
次梁
次粱
副梁


Related Translations:
secondaries:  二次波二期梅毒疹副翼羽后翅
secondary:  adj.1.第二(位)的,第二次的;中级的 (opp. primary)。2.副(的);从属的;附属的;辅助的;补充的;次要的;次等的;代理的。3.【医学】继发(性)的,第二期的。4.【地质学;地理学】中世代的;次生的。5.【电学】(产生)感应电流的;次级电流的。6.【化学】仲的,次的;副的,二代的。7.中等教育[学校]的。8.【语言学】音次重音的。9.间接的;非原始的。短
Example Sentences:
1.Shear strength at primary and secondary beam nodes of preformed holes of composite frame structure
迭合框架结构预留洞口主次梁节点的抗剪性能
2.If the optical head is on track , then the primary beam will be centered on a track ( with pits and bumps ) and the two secondary beams will be centered on land
如果光学头在轨道上,主激光束将处于轨道中心,两个副光束处于轨道之间。
3.The secondary beam of a 125 / 30t 16 . 5m metallurgy crane bridge in anyang iron and steel corporation was damaged , and this accident was reappeared by computer
本课题以事故再现的基本理论为指导,运用模拟法对安阳钢铁公司某炼钢厂125 30t 16 . 5m冶金桥式起重机发生过的一次桥架副梁被顶弯的事故进行再现分析。
4.The conclusion of reappearing analysis is that crane bridge be used as usual because main weld maximum stress of upper cover plate of main beam lower than yield limit though it higher than permissible stress . inner stress of secondary beam was over ultimate strength , and deforming is ultra big . so it was unfit for produce and secondary beam must be changed
再现分析得出的主要结论为:桥架的主梁上盖板主焊缝的最大应力超过了许用应力,但小于屈服极限,可以继续投入使用;副梁内部的应力远远超过了强度极限,变形特别严重,不能满足生产要求,因此更换新的副梁;端梁内部的应力超过了屈服极限,小于强度极限,在应力较大的位置焊接补强板;投入使用后,要对整个桥架进行定期检查。
5.Abstract : the paper probed the analysis on the adding mode of perpendicular load in multistorey building structures , the bending moment of frame side beams and the top , the bending moment of secondary beams , the difference between the tie - beam , plane - frame analysis and the space analysis on the path of conduct force , ect . it can be used as a reference when probing these problems
文摘:讨论了在多项高层建筑结构分析中垂直荷载加载模式的选择,框架边梁和次梁端部的弯矩计算,连梁问题和平面框架分析与空间分析在传力路径上的差别以及单片剪力墙平面外弯矩等问题,可供同类结构内力分析时参考
6.The ansys , a kind of fea program , was used to build model of small carriage . the procedure of gantry beam bump with secondary beam of bridge was reappeared by running nonlinear calculation and loading program which was written by apdl program language . the closest deforming result was gotten , and the deforming of main beam , secondary beam and end beam and inner stress distribution status were calculated
采用大型三维有限元软件ansys对该起重机以及小车架等进行了建模、应用apdl语言编写加载程序、进行非线性计算,再现龙门横梁与起重机副梁碰撞过程,最后得到与实际变形结果最接近的一种状态,得出起重机桥架主梁、副梁、端梁的变形以及其内部的应力分布情况。
Similar Words:
"secondary base" Chinese translation, "secondary basic accelerator" Chinese translation, "secondary bast" Chinese translation, "secondary battery" Chinese translation, "secondary battery director" Chinese translation, "secondary bed" Chinese translation, "secondary behavior" Chinese translation, "secondary beliefs" Chinese translation, "secondary beneficiary" Chinese translation, "secondary benefit" Chinese translation